For Architects & Builders
Replace Four Subs With One
Electrical rough-in through final programming. One subcontract, one schedule, one point of contact — from design phase to handover.
Our Approach
Designed In, Not Bolted On
We join the design team before framing — mapping conduit, fixtures, and keypad placement directly with the architect.
Prewire specs, lighting layouts, and tiered budget proposals drop straight into your construction documents.
One sub. One schedule. One phone that gets answered.
Builder Benefits
Architect Collaboration
We join the design team early — reviewing plans, attending site meetings, and coordinating directly with the architect.
Prewire Specs
Complete low-voltage and electrical prewire packages drop directly into your construction drawings.
Lighting Design
Lutron keypad layouts, scene design, and fixture selection coordinated with your interior designer.
One Sub, Seven Systems
Replace 3–4 subcontractors with one. Electrical, AV, network, security, and automation under one warranty.
Budget Tiers
Good / Better / Best proposals so your client can choose the integration level that fits their build.
Design Phase Input
We flag conduit runs, panel sizing, ceiling depth, and wall blocking before drywall — not after.
Our Process
Simple. Start to Finish.
One team, one point of contact, one clear path — from your first call to the day you move in.
Discovery
We start with a conversation — not a sales pitch. Tell us what you're building or fixing and we'll figure out the right scope together.
Design & Planning
We put together a detailed plan before anything gets installed — wiring routes, equipment specs, and a clear quote with no hidden costs.
Installation
One crew handles every system from rough-in to final programming. Nothing falls between the cracks when there's only one team.
Ongoing Support
We monitor your systems remotely and handle updates as they come. If something needs hands-on attention, we're local and we'll be there.
Start the Conversation
Ready to Partner on Your Next Build?
Send us the drawings. We'll flag infrastructure needs before they become change orders.